亚洲国产欧美久久_a级毛片高清免费视频中文_好姑娘6完整版在线观看高清_波多野结衣双飞中文字幕_91精品国产综合久久99精品_草莓视频在线下载观看_ysl蜜桃色成人麻豆_日本少妇裸体一区二区三区_最好看的高清视频_国产ts精品人妖系列

nav-butt
logo
首頁>News>STRONG die casting mould steel out of the "boundary" to get "good results"

STRONG die casting mould steel out of the "boundary" to get "good results"

2021-11-15


-- Determination of feeding scheme for die casting mould

Author: Li Zelin (Senior die casting mould consultant of STRONG)

When designing the feeding scheme of mould, try to get rid of the bondage of "intuition" or "inertia thinking". List all "possible" and "impossible" schemes for comprehensive analysis and comparison. Only in this way can we ensure to the maximum extent that the best scheme is adopted. In addition, it is definitely a good way to solve the problem of inexperience.

Example 1

1636703507207617.jpg1636703727434891.jpg1636703705416113.jpg

Scheme 1 

004.jpg

Scheme 2

005.jpg

Scheme 3

006.jpg

It is difficult to avoid the aeration of the small plane in scheme 1, and the last filling of the hemispherical top in scheme 2. Only scheme 3, not only can avoid the above two situations completely, but also can control the whole filling state well. Therefore, after comparison and analysis, scheme 3 is the best.


007.jpg008.jpg009.jpg

——————————————————————————————————————————————————————————————————————————

Example 2


010.jpg011.jpg012.jpg

Scheme 1

013.jpg

Scheme 2

014.jpg

Scheme 3

015.jpg

Scheme 4 

016.jpg

Both scheme 1 and scheme 2 inevitably form aeration at the top of the boss. Both scheme 3 and scheme 4 can solve this problem. Compared with this two schemes, the process of scheme 3 is longer and the number of refractions is more. The flow of scheme 4 is short, the number of refractions is less, and the flow pattern is easy to control. Therefore, after comparison and analysis, scheme 4 is the best.


—————————————————————————————————————————————————————————————————————

Example 3


017.jpg018.jpg

Scheme 1 


019.jpg

Scheme 2 ↓

020.jpg

In scheme 1, the water inflow is too narrow and the flow rate is not enough to meet the filling requirements. The scheme 2 has very high requirements for the design of flow channel. If there is a slight deviation, there will be trapped gas. And the adjustable process space is limited. Therefore, both schemes are not ideal.


Scheme 3

021.jpg

Scheme 4 

022.jpg

The aisle in the middle of scheme 3 lengthens the filling process, which is not conducive to the transmission of pressure. When eddy current is generated on both sides of the product at last, it is impossible to eliminate die casting defects by increasing the pressure. Scheme 4 can solve these problems completely. Moreover, the structure is very compact. Therefore, after comparison and analysis, scheme 4 is the most reasonable.


023.jpg024.jpg025.jpg

—————————————————————————————————————————————————————————————————————

Example 4

026.jpg027.jpg028.jpg

Scheme 1

029.jpg030.jpg

Scheme 2 

031.jpg032.jpg

Scheme 3

033.jpg034.jpg

The biggest difficulty of this device is to solve the problem of filling on both sides of A and B, and to avoid gas trapping. In the scheme 3, a small slope is specially added to the feed liquid, which successfully solves the problem. And other solutions, even if added slope, also impossible to achieve. Therefore, the scheme 3 is the most reasonable.

035.jpg036.jpg037.jpg

———————————————————————————————————————————————————————————————————————————

Example 5

038.jpg039.jpg

040.jpg041.jpg

Before determining the feeding scheme of the mould, we must "get out" and get rid of the "bondage" to see clearly and comprehensively and get the correct results. Jump out of the "boundary" to get the "right result"!





電話:0757-2332 2638

傳真:0757-2332 2619

郵件:fzz@strongmetal.com.cn

地址:佛山市順德區(qū)陳村鎮(zhèn)石洲工業(yè)區(qū)30號(hào)

備案號(hào):粵ICP備09051653號(hào)

廣東世創(chuàng)金屬科技股份有限公司   粵ICP備09051653號(hào)-1

技術(shù)支持:佛山網(wǎng)站建設(shè)

二維碼